“Milestones to Success"
March, 1970
Incorporation
May, 1970
First Job – Andress Engineering for Conveyor and Elevator
April, 1971
First Invoice – ($7,279.20) Andress Engineering
100th job - M. Kimerling & Son
1972
Brewton Iron Works – Sand System
International Harvester – Scrap Conveyors
Lawler – Sand System
1973
Lodge Manufacturing Company – Cupola
Simsco – Turner Sand System
Robinson Foundry – Sand System
Opelika Foundry – Sand System
First Cupola Baghouse Installation - Layne & Bowler’s No. 407
1974
Martin Stove & Range – Sand System
500th job – Stubbs Foundry
1st “Turn Key” Foundry project started – Brewton IronWorks, A.K.A.
Bush Hog, Bush Hog Precision
Crane Foundry/ Lawler Foundry – Cupola Baghouse
Precision Foundry Equipment Company formed
1975
Aliceville Castings – “Greenfield” Foundry
Completed 1st Shredder System – Lochamy Steel
Birmingham Shredder, Texas Shredders, Addleston
International, Indiana Scrap, Monroe Scrap, Yaffe
Vulcan’s accounting department enters computer age with “Merlin”
1976
Start construction of “South 40” with building no. 2
Mid American Recycling
John Blue Sand System
ESCO Foundry Upgrade
1977
Brisco Baling Shredder
Louisville Shredder
1,000th job – Andress Engineering
Soule’ Steam Feed – No Bake
Shalco – No Bake
ESCO – No Bake
Alloy Cast – No Bake
Mueller, Albertville – Sand System
Rockingham Stainless – No Bake
1978
Martin Stove – Foundry Upgrade
Opelika Foundry – Cupola
1979
Texas Foundry
Southwestern Foundry
Southern Cast Products “Fredscoe” – No Bake
U.S. Pipe, Chattanooga – Disa Installation
1980
Wheland Foundry – Mold Handling
Tyler Pipe – Sand System
Neptune Water Meter – Upgrade
1981
1st BMM Installation – ESP
2nd BMM Installation – Southern Ductile
American Valve and Hydrant – Mold Line
Robinson Foundry – Upgrade
U. S. Pipe, Chattanooga – Pangborn Installation
1982
U.S. Pipe, Anniston – No Bake Sand Reclamation
Anderson Electric – Foundry Upgrade
D.M.I. (now Attalla) – Foundry Upgrade
Lehigh Portland Material Handling Equipment
1983
U.S. Gypsum – Material Handling System
Charlotte Pipe – Foundry Upgrade (Herman Installation)
Vulcan’s engineering department enters computer age (TRS-80)
Roberts Foundry – No Bake
Vestal Manufacturing Pangborn Installation
1984
Purchase of Hartmann Industrial Products
Vulcan established Electrical Control Group
Robinson Foundry Upgrade
U. S. Pipe Upgrade
Fairfield Aluminum Castings Foundry Upgrade
1985
Sales Department created
Foundry Service Upgrade
1st Lost Foam System – Robinson Foundry
Purchase “Square D” property and buildings
U. S. Pipe, California – Baghouse
Lufkin Industries Harsell Baghouse
Pryor Foundry - Nobake
Hartmann Industrial Products relocated to Helena
1st Truflo to ship from Helena
1986
Imperial Clevite Foundry Upgrade
Mathews International Foundry Upgrade
OMC Lost Foam System
1st Glue Machine built – OMC
Anderson Electric Foundry Upgrade
John Deere Lost Foam System
1st fax machine at VECO
1987
Saturn/Vulcan partnership created
1st AutoCAD stations installed
OMC Lost Foam Iron Line
Emporia Foundry Cupola and Sand System
ESCO Foundry Upgrade
Southern Aluminum Castings Foundry Upgrade
1st Protofoam – Williard Industries
Carondelet Foundry - Nobake
Lebanon Cupola Pollution Control System
Champion International – Log Processor
5,000th job – Booked
1988
Fox Grinders purchased
Mid-West Machinery purchased
Unit Handling Division created
Robinson Foundry – Lost Foam Line No. 2
Bodine Aluminum – Protofoam
U. S. Pipe, Birmingham – Dust Solidification
Motor Castings – Nobake
Williard Industries – Trufoam
Styrologic/Vulcan relationship formed
Bodine/Robinson – Foam System
1st of Saturn lines delivered.
1989
Planet Corporation purchased
Saturn Cast Lines in production
1st Mid-West Stationary Grinder sold – RMI
U. S. Pipe, California – Dust Solidification
U. S. Pipe, New Jersey – Dust Solidification
Bodine Foundry Upgrade
Southern Ductile – Foundry Upgrade
Mueller – Foam System
Vulcan Foundry - Dust Solidification
Ship TF IV to Brazil
Ship TF IV to Korea
1990
Major office addition to building no. 1
Action Machinery purchased
ZSE Praha – Lost Foam System
Manoir - Nobake System
Stanton PLC – Lost Foam System
Ahlstrom Pumps – Nobake / Lost Foam Foundry
Handtmann – Lost Foam System
Vulcan Engineering Co. exceeds 21 million in sales – total 35 million
Expand Saturn Iron Cast line
1991
Central Foundry Division, Danville – Lost Foam System
Teledyne Castings – Lost Foam System
Lodge Manufacturing Company – Foundry Upgrade 10,000th job
US Pipe Material Handling
Hendrix Nobake
Dongo Lost Foam
Foroni Mid-West Grinder
Didion and Sons Truflo (1st for Sinto Molding machine )
Kimberly-Clark Chip Storage
Dexter Truflo
Industrial Heating & Finishing purchased
1992
Sand Cast Truflo and sand system
Georgia Iron Works Nobake
Bradken-Marrion Lost Foam
Conbraco Conway Upgrade
John Deere Core Sand System
ICA Truflo
Waste Management Texas
GH-Hensley Nobake
Waste Management Oklahoma
Columbus Foundry C&D Disa install
Citation Foam Trufoam upgrade
Large Automotive Company Aluminum Trufoam System
1993
Alexcon Trufoam
Jin Hong Trufoam
Hendrix plant upgrade
Wheland Foundry Upgrade
Foundry Service Truflo and sand system
Lethbridge Iron Truflo
Georgia Pacific Hot Lime Conveyor
Handtmann Castyral System
1994
K O Steel No-Bake Truflo and Sand System
Conbraco Truflo
Babcock and Wilcox Lost Foam system
Clow Valve Truflo
Union Foundry Cleaning room
Styrologic acquired
Tommie Corp. Truflo
C L Dews Nobake
1995
Texas Foundries Melting Upgrade
Arbomex Trufoam
Conbraco Nobake
Rochester Disa install
T B Woods Truflo
Saturn Glue and Molding Machines
Clow Flask Handling
Charlotte Pipe and Foundry Disa install
Large Automotive Company 3 Trufoam Castlines (delivery 1996 )
Benton 2-Truflo IV
1996
Lovink Trufoam
Donovan purchased
Charlotte Pipe and Foundry Herman Dust Collection
Castexpo 1996
Reliable Bethea Truflo and upgrade
1997
Alexander City Castings Lost Foam Upgrade
Mueller Co. Lost Foam Upgrade
Citation Foam C & D Lines
Griffin Pipe
Cagiva - 3 Trufoam Castlines
American Foamcast Trufoam
Ancast Truflo IV
Richards aquired
Dixie Pattern and Tooling aquired
Timet Mid-West Grinder
Conbraco Expansion
Bethea Truflo for Sinto
Big Four No-Bake
1998
“The Vulcan Group” sold to WAFRA
BMW Protofoam upgrade
Large Automotive Company Castline #4
Large Automotive Company Thermal reclaimers
Farrar foundry upgrade
Large Automotive Company Pre-Expanders
J&L Fiber No-Bake Truflo
U S Casting Truflo and upgrade
Mercury Marine Thermal Reclamation
Foundry Of The Shoals Truflos
Vulcan Group Management Team Founded
1999
Mueller Albertville Tru-Foam Castline
Union Foundry Upgrade
Charlotte Pipe TruFlo
Mueller Chattanooga Tru-Foam Castline
Matthews Foundry Upgrade
Alexander City Castings Tru-Foam Upgrade (lines 1 & 2 )
Gartland Foundry Upgrade
D&L Foundry Flask Handling
Montupet Tru-Foam
Large Automotive Company Pattern Assembly Machines
M&H Valve Mold Line
Lodge Foundry Upgrade
2000
Mercury Marine Castyral TruFoam
Large Automotive Company 4 Casting Cells
Babcock & Wilcox Thermal Reclamation
M&H Valve Foundry Upgrade
Benton Foundry TruFlo for Disa
Texas Foundry Disa Installation
Pacific Cast Technologies Investment Casting Shell System
2001
Nemak SA Reclaim
Zimmer Inc Robotic Shell System
Nucor Steel Birmingham Billet Handling
US Foundry & MFG Corp Rework Entire Sand System for BMD Line
PCC Structurals Robotic Investment Casting Finish
Phillips Foundry Complete Foundry
Kovatch Castings Robotic Vertical Cabinet Shell System
Tyler Pipe Company Cupola Jib Crane Replace
Howmet Corp 8000 lb Investment Shell Room Robot
2002
US Pipe & Foundry Co Cupola Upgrade
Romac Industries Robotic Casting Cleaning
American Foam Cast Foam Molding Machine
Large Automotive Company Precision Sand Engineering
PCC SSBO Robotic Wax Assemblies (Investment)
2003
PSA Peugeot Citroen Complete New Lost Foam Cast Line
American Cast Iron Pipe Co Core Room Automation
Martin Sprocket Green Sand Molding System
Bayerische Motorenwerke AG Production Line Modification
The Dexter Company Lost Foam Cleaning Room Upgrade Phase 1
Cifunsa Greenfield Disa Facility
Large Automotive Company Precision Sand
PCC Structurals Robotic Titanium Casting Finishing
Kovatch Castings 54" Fluid Bed Sander
2004
Production Pattern & Foundry Co New Green Sand
Progress Casting Group Perm Mold Machine Tending
D & L Foundry Manipulators to handle castings
2005
--
2006
--
Vulcan Engineering Co. 2006

Vulcan Engineering Co. is located in the Helena Industrial Park in Birmingham, Alabama USA.